2 Beds

2,272 sqft

$600,000

16791 Boca Delray Drive Delray Beach FL, 33484

Estimated payment: $4,682/mo

Price per sqft

$264.08

Built in

1986

Property size

2,272 sqft

Property type

Residential

Garages

2

Overview

Additional information

MLS ID

R11058672

Interior features

Total Stories

1


Bedrooms

2


Total Bathrooms

3


Full Bathrooms

2


Half Bathrooms

1


Interior Features

Breakfast Bar, Breakfast Area, Dual Sinks, Entrance Foyer, Garden Tub/Roman Tub, Living/Dining Room, Pantry, Split Bedrooms, Skylights, Separate Shower, Tub Shower, Vaulted Ceiling(s), Walk-In Closet(s)


Appliances

Dryer, Dishwasher, Electric Range, Electric Water Heater, Microwave, Refrigerator, Washer


Floor Description

Ceramic Tile, Laminate


Fireplace

No


Cooling

Yes


Cooling Description

Central Air, Ceiling Fan(s), Electric


Heating

Yes


Heating Description

Central, Electric

Exterior features

Lot Size

0.17 Acres


Exterior Features

Enclosed Porch, Patio


Lot Features

Interior Lot, Sprinklers Automatic, 1/4 Acre


Architectural Style

Ranch


Roof

Composition, Shingle


Sewer

Public Sewer


Patio And Porch

Patio, Porch, Screened


Security

Gated with Guard, Smoke Detector(s)


Window

Sliding, Skylight(s)

Other property details

Area Name

4640


Taxes

$8,302


Tax Frequency

Annually


Days on Market

88


Association Fee

$797


Association Fee Frequency

Monthly


Association Amenities

Bocce Court, Billiard Room, Clubhouse, Golf Course, Library, Management, Pickleball, Pool, Putting Green(s), Sauna, Tennis Court(s)


Garage

Yes


Garage Spaces

2


Parking

Attached, Driveway, Garage, Garage Door Opener


View

Yes


View Description

Golf Course, Lake


County

Palm Beach


Water Source

Public


Pool Features

None, Association, Community


Waterfront

Yes


Waterfront Features

Lake Front


Utilities

Cable Available, Electricity Available, Sewer Available, Water Available


55+/Senior Community

Yes

Listed by: Lang Realty/ BR
Listing Contact:  

All listings featuring the BMLS logo are provided by Association of Palm Beaches. This information is not verified for authenticity or accuracy and is not guaranteed. IDX information is provided exclusively for consumers’ personal, non-commercial use, that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing, and that the data is deemed reliable but is not guaranteed accurate by MLS.

©2025 Association of Palm Beaches. All rights reserved. 

Data last updated 10:58 PM UTC, 5/2/2025

 

Powered byLuxury Presence